Calculating Time and Materials

WireTracks Original
WireTracks requires some installation effort. To estimate installation time, please use the following guidelines for a 12 x 15 room:

Type of Installer Estimated Time
Homeowner / DIYer 6-8 hours per room, 2 hours per doorframe
Remodeler/Contractor 3-4 hours per room, 1 hour per doorframe
Trim Carpenter 2-3 hours per room, 45 minutes per doorframe

 

When calculating materials, measure the length of the walls where you will install WireTracks and add 10%. Add 2 1/2 8' sections for each doorframe that the WireTracks wiring channels will go around.

 

WireTracks NC
WireTracks NC adds very little time to a new construction project. However, it saves time and money because there is less wiring to install.

The following are the major changes in the construction process when using WireTracks NC:

  • WireTracks NC wiring channels must be laid down before the sheetrock at a level above the flooring.
  • If 92 5/8" studs are used, the sheetrock must be trimmed. This can be avoided by using 96" studs.
  • Trim is glued to the WireTracks NC channel cover instead of nailed to the wall.